"they have maintenance outages like anything else"
not often and most importantly they are PREDICTABLE. You do understand why being able to control when a power plant is operating is a very important thing, right?
i thought the conversation was regarding utilization of capital, in which case 80% is 80%, predictability doesnt change the fact you have to let GPUs sit idle 20% of the time.
I guess if I knew there would be two months with less power I might design my data center to fit into 40 foot containers so I could deploy wherever power and latency are cheapest
The point here being that every single datacenter that's running off nuclear also has a natural gas pipeline running to it or else a massive propane infrastructure because nuclear alone can't get the job done. If your 'clean energy' solution requires a gas pipe, you're misrepresenting its ability to drive the datacenter.
not often and most importantly they are PREDICTABLE. You do understand why being able to control when a power plant is operating is a very important thing, right?