Assuming 1 manager oversees 10 people (then -1 to subtract lowest level of engineers).
Google 190,000 => ~4 levels of managers (5 - 1 = 4)
Apple 164,000 => ~4
etc.
Assuming 1 manager oversees 10 people (then -1 to subtract lowest level of engineers).
Google 190,000 => ~4 levels of managers (5 - 1 = 4)
Apple 164,000 => ~4
etc.