The reason its arranged like that is because it started as 1 switch and 1 patch panel, and slowly evolved, so its not ideal, but I am fairly happy with the outcome
If I could re-rack it all, I might make some changes. But that means turning everything off, and I'm not sure when, if ever, I want to do that
I had the patch panels above a collection of switches in both the MDF and IDF closet. About a year in I rearranged it to the more common interleaved switches and panels, mostly just to make it look a bit cleaner.
I moved from 10g to 40g for switch interconnects in a few places, as well as used the fiber I installed to do 10g to most of the desktops, etc. Fun stuff for sure!
If I could re-rack it all, I might make some changes. But that means turning everything off, and I'm not sure when, if ever, I want to do that